Type of project | PRoR (2.1 Hrs.) |
Catchment Area | 72.2km2 |
Design Discharge | 5.15m3/sec |
Net Head | 1003m |
Installed Capacity | 44 Mw |
Annual Energy | 257.67 GWh |
Headrace Tunnel | 3307m |
Penstocks Pipe | 1160m |
Powerhouse | Surface |
Transmission Line | 24 Km.( Sharing among 3 projects) up to Hitar Sub Station |
Road Construction | 3 Km for Powerhouse and 12 Km. fo Intake from powerhouse |