| Type of project | PRoR (2.1 Hrs.) |
| Catchment Area | 72.2km2 |
| Design Discharge | 5.15m3/sec |
| Net Head | 1003m |
| Installed Capacity | 44 Mw |
| Annual Energy | 257.67 GWh |
| Headrace Tunnel | 3307m |
| Penstocks Pipe | 1160m |
| Powerhouse | Surface |
| Transmission Line | 24 Km.( Sharing among 3 projects) up to Hitar Sub Station |
| Road Construction | 3 Km for Powerhouse and 12 Km. fo Intake from powerhouse |